CDCR: As-Needed Contract

california Department of Corrections and Rehabilitation

In 2006, Hibser Yamauchi Architects was awarded a Retainer Agreement contract for the State of California Department of Corrections and Rehabilitation. That contract was set to run through 2009, but it became apparent that a 2nd contract, running through 2010 would be needed in order to complete all the necessary projects. HY was awarded the contract, due mainly to the exemplary work done under the original retainer agreement. This contract was again awarded to HY for a subsequent contract period as well.

Our work includes seismic, ADA and general finish upgrades as well as general repair and maintenance services for facilities throughout the State.  Some recent projects have included:

• Small Management Yards

• Roof Replacement (Main Gym)

• Roof Replacement (Cascade)

• Roof Replacement (Sierra)

• Roof Replacement (Chapel)

• Stockton INYO Living Unit Upgrades

• Chowchilla ADA Quality Scope Review

• Disability Placement Plan Visitor

• Construct East Facility ADSEGEOP

• Roof Replacement East Facility Gym

• Building U Floor Repair

• R.J. Donovan Housing Unit #4 & #5

• R.J. Donovan Housing Admin Roof Replacement

• R.J. Donovan Housing Observation Tower

• Ione Preston Youth Authority Facility

• Soledad SMY

• Reroof Chapel at Ventura

• San Quentin Small Management Yards

• Preston OAKS Rec Area

• Preston REDWOOD Rec Area

• Sm. Manag. Yds at Pleasant Valley

• Sm. Manag. Yds at Avenal State

• SATF Corcoran


Location Statewide
Client California Department of Corrections and Rehabilitation