Alhambra High School

Martinez unified school district

As the first phase of work from the district-wide master plan, completed by HY Architects, we have recently completed design of a new classroom building addition and several modernization projects throughout the Alhambra High School campus.


The new classroom building is a 13,000 sf modular building that includes:

   • A computer science classroom

   • Special education life skills classroom (high school students)

   • Special education/life skills classroom (18-22 year olds)

   • Leadership classroom for CTE program

   • Two elective classrooms

   • Breakout spaces

   • Common area for student collaboration and meetings 


The modernization projects are being executed in three phases and include:

   • Converting an existing metal shop to a new CAD / drafting skills lab

   • Converting existing space into a new digital arts and digital photography program

   • Modifying existing classrooms

   • Designing a new science/lab classroom


All spaces include flexible, modular furniture in order to provide maximum flexibility and configurations for teaching.

Location Martinez, CA
CLient Martinez USD